Anguar Runway Clearing

Aug. 18, 2020 | Aug 28, 2020

Expansion of Angaur Airport Runway-Marines Koa Moana20. Runway clearing length: 7,200Lx250W, removal of trees and soil.


PIA Safety Area

STAGE 1- Feb. 10, 2021 – Feb. 24, 2022

STAGE 2-Aug. 20, 2021 – April 17, 2021

Runway Safety Area Saturated Soil Rehabilitation and Drainage Improvement, Replacement of Satureated Soil, Crack sealing, Installation of New Concrete Slab, Installation of New Waterlines and Hydrants, Installation of a New Concrete U-Ditch


PIA Renovation & Expansion

July 2019 | November 2020

Renovation & Expansion of Palau International Airport Project (Civil and Structural Works Package)


PIA Secondary Apron

| 2014

$11M

Grading of the in-field, construction of 2 taxiways, drainage system, & 4 inch thick asphalt base course at the apron & taxiway, Installation of electric conduits w/ pull wires, retaining wall, & POL line.


PIA loading Bridge and Concourse

| 2009

$2.704M

This project consisted of the construction of two structural steel concourses, measuring at 130 metric tons, installation of two passenger loading bridges/jet way, asphalt paving of 236 sq. m., and concrete pouring for foundation, columns, and slab.