Excavation/Dredging/Earth Moving

The Project for the Construction of National Landfill

Apr. 2019| Nov. 2020

$4.2M

Soil transportation to residual soil area and embankment. Units of soil moved: 222,740.00 CU.M. Preparation Works, Temporary Works, Earth and Civil Works and Architectural Works


Ngeremlengui Army Shooting Range

May 2019 | May 2019

A study in light, color, and form. Created in studio with a collection of damaged lenses that I’ve acquired over the years. Each is available as a 18×24 inch giclee print on archival paper.


Ngatpang Shooting Range

August 2021| November 2021

A study in light, color, and form. Created in studio with a collection of damaged lenses that I’ve acquired over the years. Each is available as a 18×24 inch giclee print on archival paper.

Let’s build something together.

Looking for something?

Throughout our growth, Surangel and Sons Co. has remained privately owned and run by the Surangel family. Our Christian faith and dedication to the Seventh-day Adventist Church have guided our business operations and played a key role in our success.

Powered by WordPress.com.